Project Modules

The work plan of the project includes three main phases:

The following sections of work are envisaged in order to achieve the sub-objectives of the project mentioned

  1. the definition and specifications of the system
  2. the implementation of infrastructure, data display procedures and user interfaces
  3. integration and pilot testing / evaluation

PM1. Requirements analysis and system design

The aim of the PM1 is to specify the user requirements and technical requirements for the system to be developed as well as the definition of the general system architecture (at a high level)

PM2. Implementation of infrastructure

The aim of PM2 is the implementation (installation and configuration) of the firmware infrastructure, in particular the sensor network, the network and communication equipment and the basic general platform for data processing and display.

PM3. Implementation of software units

The goal of PM3 is the development of the platform’s innovative software units and, in particular, the calculation of the required monitoring parameters and the implementation of the user interface.

PM4. Completion, control and pilot tests

The aim of the PM4 is to complete the system and evaluate its effectiveness / value through pilot tests on a merchant ship. Also included in EU4 are the communication / dissemination actions and the exploitation plan of the project results.